Draft re-determination to resolve a dispute between C&W, CPW and Gamma against BT about Carrier Pre Selection set-up charges

Cyhoeddwyd: 8 Chwefror 2010
Ymgynghori yn cau: 22 Chwefror 2010
Statws: Ar gau (cyhoeddwyd y datganiad)

This dispute is about the charge that BT makes to CPS operators when it applies carrier pre-selection (CPS) to a line (except where CPS is provided in combination with wholesale line rental (WLR), when a different charge applies). This charge is listed in BT's Carrier Price List as Set-Up Switch change effected and referred to in this document as the CPS set-up charge.

Yn ôl i'r brig